Click some pictures to be directed. Scroll down to read MORE Outreach News
News & Upcoming Events
Drywall, Framing, and Concrete
August 9, 2024Bachmann Construction is continuing with framing the back attachment, laying drywall on the 3rd floor, (2nd floor ceiling), and pouring the concrete over the 1st floor dirt pit. The Bachmann crew has laid out the floor plan on the 2nd and 3rd floors and has begun laying drywall! Before pouring concrete, we have BEFORE pictures …Read More