Veteran’s Housing Units- 210 West Fulton Street

Veteran’s Housing- 210 West Fulton Street

Learn About the Renovation Process

Click here to view.

Built in 1854, the Taylor House/American House, originally served as a hotel.  Henry Edward “Ed” Peters began operating his business at this location in 1896.  Various family members assisted in the running of the businesses housed there; tavern, arcade, bowling alley, Rousch’s Market, Peters  Market.  Another local family operated Peters Market from 1967-1979.  From the ’80s till the present, the lower level has housed many operations including the Rocking Horse (craft store), Mrs. G’s Game Room, an office supply store, Team Heating and Cooling, and Edward Jones just to name a few. In 2019, the city of Edgerton sold the property to Edgerton Community Outreach for $1. ECO partnered with GMK Architecture, Inc. and Bachmann Construction to evaluate the building. Renovation is officially complete! View the construction updates throughout the process!

Please send completed applications via Fax, Email, or Mail. Applications can be dropped off in person at our office location.

106 S. Main St Edgerton, WI 53534

Email: outreachbrehmer@gmail.com Fax: 608-531-2765 Phone: 608-884-9593

Important Application Instructions

Please be advised that any incomplete applications will be returned and discarded if not amended. In order to be considered for an available unit or placement on the waiting list, all required documents must be submitted along with the application.

The following paperwork is required to complete your application:

  1. Completed Application Form (available for download below)
  2. Proof of Military Service (including Veteran Status Confirmation; downloadable below)
  3. Identification Card (government-issued ID)
  4. Proof of Income (documentation for the last 60 days)

Incomplete applications will not be processed, until all required documents are provided.

“Please download the attached paperwork to complete either electronically or by printing. Once completed, kindly submit your application via email, fax, or mail.

For efficiency, we recommend completing the application electronically and returning it via email. Simply download the application and fill in the required information, along with other required documentation.

STUDIO

Apartment A– Second Floor

STUDIO

Apartment D– Third Floor

One-Bedroom

Apartment C- Second Floor

One-Bedroom

Apartment F- Third Floor

Two-Bedroom (ADA Accessible)

Apartment B- Second Floor

Two- Bedroom (ADA Accessible)

Apartment E- Third Floor